Location
London
Value
£3m
Procurement Route
Single Stage Traditional
Sectors
Service Provided
If you would like to get in touch, please give us a call or email the office
New building is positioned over a Thames Water sewer system, so an advanced engineering solution was required to avoid interference. Minor interventions to the existing vestry are to be carried out concurrently with the extension.